On 26th March 1993, the discovery well 15/9-19 SR was up for completion and production testing. The well produced at a maximum rate of 1358 m3/d. This was the turning point for a journey, that started in 1976, when the Block 15/9 along with Block 15/8 was awarded the Production License (PL) 046.